Capabilities
Integrated Chip Clean Room Air Handling and Ultra Pure Water System HMI
Maxim Integrated Device,
Beaverton, Oregon - System Integrator
In
the Maxim project we were responsible for the
design, configuration, debugging and integration of
Man-Machine interfaces to /PLC-based control system. Graphic
screens were developed in Intouch Wonderware.
Ending the project at 1000 total Wonderware tag count. The project was set up to
work through 2 distributed stations.
PLC programming was done with
a Modicon TSX
Quantum PLC. A
network had to be designed
to accommodate the two stations, using Ethernet and Modbus
connection the network worked without flaw. To wrap up the project we did a
field checkout and gave some startup
training.
Gas System Modifications
Tri-Quint Portland, Oregon - System
Integration
Existing hazardous gas monitoring system was being
expanded to included new gas sensors. The GE 90-30 PLC and Wonderware was
modified to add the new gas sensors. Training and Gas testing was
included.
New Chip Foundry
Facility
Wafertech,
Camas, Washington - Construction/Engineering Support
Engineering,
installation and startup support for over 2000 instrumentation. Project
required script generated loop AutoCAD drawings, ISA instrument specification
sheets, cable runs, termination cabinets and purchasing.
Epitaxy Expansion
Project
Wacker Silronics Corporation,
Portland, Oregon - Project Manager
Completed the last year of a three year
project to expand a class 10 Epitaxy clean room which required new walls, new
ceiling, new flooring, tool install, tool relocation, utilities hookup, facility
hookup, piping, automatic doors, equipment pass-through, temporary walls, room
air balance, room air flow, air handlers, controls systems, DI water,
ionization, data connections and electrical. Project included remodeling of over
2000 sqft of clean room, addition of 1200 sqft of clean room and an addition of
over 3,000 sqft of support facilities.
Installation of
Crystal Pulling Machine
Wacker Silronics Corporation,
Portland, Oregon – Project Engineer
Installation of Crystal
Pulling Machine - Project was a team approach to installation of 2 German built
silicon-growing machines. Project required a trip to Germany to review
installation of pullers in two facilities and make changes required for the
equipment to be installed in the USA.